Far East Interceptor Cottage Grove Extension Liner

The Far East Interceptor Cottage Grove Extension was constructed in 1981 with 2475 linear feet of 18” diameter reinforced concrete pipe and 3035 linear feet of 18” diameter cement lined ductile iron pipe.  There are no service connections.  The project includes all work necessary to furnish and install complete, a cured-In-place pipe (CIPP) liner. The Contractor shall provide all materials, labor, equipment, and services necessary for diversion of sewage flows, cleaning and television inspection of sewer to be lined, liner installation, and final television inspection of lined interceptor.