Rehab of Pump Stations 1, 2, and 10
Bid Opening: May 22, 2003
 
    Contract Contract       Contract Multiple Multiple Multiple
    PS1/2/10-A: PS1/2/10-B:   PS1/2/10-C: Contract Contract Contract
    General Mechanical Pump Motor VFD Electrical Deduct: Deduct: Deduct:
NAME OF BIDDER   Construction Construction Manufacturer Manufacturer Manufacturer Construction PS1/2/10-A PS1/2/10-B PS1/2/10-C
       
Staab Construction Corp.    $               967,000.00  $         4,544,000.00 Cornell Toshiba ABB    $             20,000.00  $             40,000.00  
       
Joe Daniels Construction Co., Inc.    $             1,224,000.00    
       
Tri-North Builders, Inc.   Did not bid    
       
J.H. Findorff & Son, Inc.   Did not bid Did not bid Did not bid Did not bid Did not bid Did not bid Did not bid Did not bid Did not bid
       
Bachman Construction, Inc.    $               993,001.00    
       
J.F. Ahern Co.      $         3,975,000.00 Cornell Toshiba ABB    
       
Advance Mechanical Contractors, Inc.     Did not bid Did not bid Did not bid Did not bid    
       
H&H Industries, Inc.      $         4,106,000.00 Cornell Toshiba ABB   None  
       
H&H Electric Co., Inc.      $         1,350,000.00   None
       
Town & Country Electric (Faith Tech.)      $         1,124,000.00    
       
Pieper Electric, Inc.              $         1,141,233.00      
         
         
Low Bid: PS1/2/10-A: General Constr.   Staab Construction  $           967,000.00  
         
Low Bid: PS1/2/10-B: Mechanical Constr.   J.F. Ahern  $         3,975,000.00  
         
Low Bid: PS1/2/10-C: Electrical Constr.   Town & Country Electric  $         1,124,000.00  
         
    Grand Total:  $         6,066,000.00